Ziinga Sign In

Look Up a Plot on the Master Plans Page and See the Building Its Zone Allows, in 3D

Ziinga Team · October 31, 2026 · 4 min read

What changed

On the master plans page, at ziinga.rw/master-plans, a parcel you look up by its number (its UPI) now gets a panel headed "What may be built here". Ziinga reads the parcel's zone, finds that zone's rules in the regulation that applies (the City of Kigali Zoning Regulations of 2020 for Gasabo, Kicukiro and Nyarugenge, the National Land Authority's zoning regulations elsewhere), and raises a box on the map: the largest building those rules allow on that plot. The panel names the zone, the regulation and the page the rules are on.

What you can move

  • Storeys and the share of the plot built on. Two sliders, each stopped at the zone's own limit. Where the table sets no limit, the slider starts at the Workspace site screen's default, 60% of the plot and G+1, and the line says "assumption".
  • Floor height. From 2.8 to 4 metres, starting at 3.2. No regulation sets it, so it is always marked as an assumption.
  • The numbers beside them. The footprint, the total floor area, the height, and in a residential zone about how many homes of 80 m² that floor area holds. The 80 m² is Ziinga's assumption, not a rule.

Checked against the rules, in words

Under the sliders, each rule the zone sets is read against what you chose and marked Within, Over or Not set: the share of the plot covered, the storeys, the floor area ratio (total floor area divided by the plot) and the share that must stay landscaped. The panel never trims a choice to fit. It flags it and says what the rule does allow.

Take a 500 m² plot in zone R2 in Kigali. The zone allows 60% coverage and up to G+3, but a floor area ratio of 1.4, and asks for at least 20% landscaped. The panel opens at 60% and G+1: a 300 m² footprint, 600 m² of floor area, 6.4 metres high, about 7 homes, and a ratio of 1.2, within the cap. Push it to G+3 and the box rises to 12.8 metres, but the ratio becomes 2.4, and the panel says it is over the 1.4 the zone allows and that at 60% coverage the zone allows G+1. In R2 the floor area ratio, not the storey limit, decides how tall you can go.

What it assumes

Setbacks, the distances a building must keep from the plot's edges, are printed in the regulations but not yet copied into Ziinga. So the footprint on the map is the plot's own outline shrunk to the covered share and centred, and the panel says so; where a building actually sits is the designer's choice. If a zone has no building rules written into Ziinga for that district, the panel says that instead of drawing a box. An envelope is not a permit: setbacks, access, height in metres and approvals still apply.

Two next steps

  • Screen this site in the Workspace. One button opens the Workspace site screen with the parcel already filled in. It works out schemes for the plot and what each could pay for the land, from the same rules. It asks you to sign in.
  • Download for Rhino. Two files: the plot's outline and the envelope in metres as an .obj file, and a .json file with the envelope's figures, the regulation and page they come from, and a prompt for GenEnv's massing-design skill. The setbacks in it are left empty for the architect to set.

Where to start

Open the master plans page, at ziinga.rw/master-plans, choose a district and type a parcel number. To read what a zone allows in full, see the zoning guides; to see what the parcel is worth, try Ziinga Value.

← All articles

Loading the interactive experience…